Portfolio

CANDOR ROAD BASEMENT

Kitchen Relocation from lower to upper level. Lower level area now has 2 bedrooms, Family area, Kitchenette, Full bathroom.

Structural Upgrades & Framing: Wall removal and demolition lower
level, 4 column supports installed, Lower level Entrance relocated, 3 new double hung windows, 2 bedrooms/bathroom framed.

Systems Updates: Power, Plumbing, HVac system additions, All lighting recessed, outlets/switches. Underground plumbing relocated for Kitchenette & full bathroom. Interior perimeter drain and sump pump.

Finish Work: Sub Floor under Luxury Vinyl Plank, Drywall, Taping & Finishing, New Cabinetry, New Appliances Installed, Solid Composite
Countertops, Stainless under-mount bowl sink, Kitchenette faucet,
Carpentry trim work, Priming and Paint, 2 bedroom Carpet installation, Closet organizers installed

CANDOR ROAD Kitchen

Kitchen Relocation from lower to upper level. Original Kitchen 9×12 area, New Kitchen space 16 x20.

Structural Upgrades & Framing: Wall removal and demolition in
upper levels, 2 header beams installed, Front Entrance double door added,2 existing windows replace by single 7 ft x 3 double casement
window.

Systems Updates: Power, Plumbing, H-Vac system additions, All
lighting recessed and pendant lighting, outlets/switches

Finish Work: Sub Floor under Luxury Vinyl Tile, Drywall, Taping &
Finishing, New Cabinetry, New Appliances Installed, Polished Concrete Countertops, Tile and Backsplash, Stainless under-mount double bowl sink, Adjustable Gooseneck Kraus faucet, Garbage Disposal unit, Carpentry trim work, Priming and Paint,

St. Andrews master bath

Shannon Mills basement

Finished Basement. Basement area to include Family, Media Entertainment area, Kitchenette, Full bathroom with spa construction.

Structural Upgrades & Framing: All exterior walls framed, Insulated, wall built with cement board including inset storage

Systems Updates: Fireplace unit installed, gas lines, Power, Plumbing, HVac system additions, Electrical panel updates, All lighting, recessed lighting, outlets/switches, Bathroom Spa 30amp power electrical addition.

Finish Work: Vapor barrier underlayment, Bruce engineered waterproof hardwood flooring, Drywall, Taping & Finishing, New Cabinetry, Beverage Center, Quartz Countertops, Stainless under-mount bowl sink, Adjustable Gooseneck faucet, Carpentry trim work, Priming and Paint.

Phillips Lane bathroom

Pember Street kitchen

Kitchen Expansion/Remodel

Structural Demolition & Preparation: Client request more open kitchen concept with expanded eating area

Structural Upgrades & Framing: Wall removal and demolition to expand kitchen/eating area, Expand opening for load bering wall, 1 header beam and 2 support columns installed, 1 existing bow window replace by energy efficient 6 ft x 4ft bow window. Kitchen area ceiling lowered to 8ft.

Systems Updates: Mechanical, Electrical, Plumbing): Power, Plumbing, HVac system additions, All lighting recessed lighting, outlets/switches

Finish Work: Sub Floor under Luxury Vinyl Tile, Drywall, Taping & Finishing, New Cabinetry, New Appliances Installed, Quartz Countertops, Stainless under-mount double bowl sink, Adjustable Gooseneck Delta faucet, Garbage Disposal unit, Carpentry trim work, Priming and Paint,

Woodfield master bath

Southward Drive hall bath

Nicholas Drive master bath

Constellation Drive basement bath

Constellation Drive hall bath

Second Street kitchen

Nicholas Drive flooring

Mackall Dr. kitchen

Scroll to Top